How a copper mine compressed ramp-up readiness from two years to 100 days.
A LATAM copper mining major preparing a new pit ramp-up faced an 18-24 month operational readiness timeline with a Big Four consultancy. VSC delivered the same scope — 13 functional areas, full SAP PM integration, ISO 55000-aligned outputs — in 100 days, with the capability installed in the client's team and the senior-operator validation built into every deliverable.