Case Studies — Field results, not slideware

What we've actually shipped.

Operational Readiness compressed to 100 days. Maintenance programs deployed with effort reduction far above industry standard. Agentic software inside live operations. Each case is anonymized for client confidentiality — the numbers are real.

Field Ledger
MA
Mining · MagORAI
LATAM Copper Major — Operational Readiness
100d
ME
Forestry · MagEAM
Pulp & paper plant — Maintenance Readiness
94%
RG
Energy · Reliability Genius
Thermal generation plant — RCM acceleration
+8%
PM
Mining · Permit Mastery
Lithium project — permit acceleration
6mo
NX
Chemicals · Nexus
Process plant — corporate brain rollout
-50%
25+ Engagements delivered across LATAM heavy industry
5 Sectors served — mining, energy, megaprojects, chemicals, forestry
$80M+ Combined savings unlocked for client P&Ls
Above standard Average first-delivery quality score across engagements
Featured field results

Real engagements, real numbers.

Industry
Service
All case studies 8 cases · filterable by industry and service
Forestry · MagEAM
Drastic reduction Effort reduction
Forestry MagEAM

Pulp & paper plant maintenance program compressed from 22,000 hours to 1,200.

A South American pulp mill replaced a year-long maintenance program build with VSC's accelerated FMECA/RCM framework. Same scope, ISO 14224 outputs, SAP PM-ready — in under 8 weeks.

Request full case
Energy · Reliability Genius
+8% Asset availability
Energy Software

Thermal generation plant moved from reactive to predictive in 60 days.

5,000+ critical assets RCM-accelerated through Reliability Genius. The plant's reactive maintenance share dropped below 25% in the first six months post-deployment, with measurable availability gains.

Request full case
Mining · Permit Mastery
6mo Saved in permitting
Mining Software

Lithium project anticipated three regulatory roadblocks before they hit the critical path.

Permit Mastery flagged three ESG-driven approval risks early enough that the client's permitting team could pre-empt them. Net schedule saved: ~6 months on a 28-month project.

Request full case
Chemicals · Nexus
-50% Onboarding time
Chemicals Software

Specialty chemicals plant captured retiring experts' know-how before they walked out.

Nexus deployed in a continuous-process plant facing simultaneous retirements of three 25-year operators. Engineering onboarding time for new hires fell ~50% in the year following rollout.

Request full case
Mining · PMO Corporate
8 Active project portfolio
Mining Software

Iron ore operation replaced steering-committee theatre with real-time portfolio health.

PMO Corporate gave the C-level real-time visibility across 8 active capital projects. Status reporting went from monthly retrospectives to live executive decision-support.

Request full case
Megaprojects · MagORAI
$50M+ Ramp-up loss avoided
Megaprojects MagORAI

A $1B capital megaproject avoided a 6-month ramp-up delay.

MagORAI baselined the operation across 13 functional areas pre-handover, identifying the 4 critical gaps that would have stalled production. The client closed them before the asset went hot.

Request full case
Mining · MagEAM
$210K+ OPEX savings/year
Mining MagEAM

Open-pit gold operation rebuilt its full maintenance strategy in 9 weeks.

MagEAM compressed what the previous EPC consultant had quoted as a 14-month project. Outputs deployed straight into SAP PM — no rework, no consultant in the middle of the implementation.

Request full case
Energy · MineChain
3x Contracting throughput
Energy Software

Renewable developer tripled contracting throughput without expanding the team.

MineChain automated vendor scoring, contract drafting and exception flagging across the developer's procurement pipeline — releasing the senior team to focus on the highest-value negotiations only.

Request full case
Coming Soon
+ New case study
In Review

Additional case studies under client confidentiality review.

Several recent engagements are being formalized for external publication. Reach out to discuss whether one applies to your operational context.

Request preview
Client voice

VSC delivered in 100 days what our previous consultancy quoted as 24 months. The deliverables stayed in our systems, not in a slide deck somebody had to chase down.

VP Operations · LATAM Mining Major

Quote anonymized per client confidentiality clause. Source verifiable under NDA on request.

Free Tool · Lead Magnet

Want a preview of what we'd find in your operation?

The MagORAI Scorecard runs the same diagnostic logic VSC applies in its consulting engagements. 12 minutes, 13 disciplines, AI-generated executive report — delivered to your inbox.

Start Assessment Free · 12 minutes · Confidential · ES / EN

Tell us about your operation.

Every case in this page started as a 30-minute conversation. No PowerPoints. No generic pitch. We listen to your context and respond with an honest assessment of fit — or send you to someone who fits better.

30 minutes · Your specific case · Honest assessment.