Large-scale mining: the concentrator ready for the start of operations.
A large-scale mining project brings together dozens of contracts, several owner departments and engineering that keeps changing until the end. VSC prepares the operation during the design and construction of the plant, and leaves maintenance management defined to support the operation.
The plant is handed over finished, but the organisation is not always ready to run it. Master data reaches the ERP late, critical spares are not sized, and procedures are written once commissioning has already started. Ramp-up pays the bill.
In large-scale mining the problem is not missing information: it is scattered across engineering, the EPCM, vendors and the owner's departments. VSC organises it by discipline and by phase, and shows the owner what is missing before each phase gate.
Where VSC fits in the large-scale mining process
Before the start of operations, MagORAI organises what each area must have ready; from the start of operations, MagEAM manages the maintenance work on that same equipment.
- 01Mine
- 02Crushing
- 03Grinding
- 04Flotation
- 05Tailings & water
- 06Shipping
What VSC does in large-scale mining
What VSC resolves at each moment of the asset life cycle, what it uses, and what stays with your team.
| Moment | What VSC does | With | What stays with your team |
|---|---|---|---|
| Before deciding | OR diagnostic ahead of the phase gate: the real state of readiness by discipline and by phase, with verifiable evidence. | VSC service | Prioritised gaps and a closure plan. |
| Engineering and construction | Operational readiness plan by department, with owners, dates and deliverables tied to concentrator start-up. | MagORAI | A living plan and progress in plain sight for the owner. |
| Before the start of operations | Maintenance ready to operate: asset hierarchy and master data under ISO 14224, criticality, failure-mode-based plans and spares for crushers, mills, conveyors, flotation cells and pumps. | VSC service with AI agents | Data loaded into your ERP, validated by a VSC senior expert. |
| People and organisation | Staffing, operating and emergency procedures, and training by area. | VSC service | An organisation ready to operate. |
| In operation | Maintenance work management: from the field notification to the work order, planning, scheduling and close-out, with the supervisor approving each step. | MagEAM | Work executed, closed and measured. |
Agents do the work; an expert signs it
Diagnostic
Real state by discipline and by phase, with verifiable evidence.
Agentic execution
Agents process documents, data and systems.
Expert validation
Nothing leaves without a VSC senior expert's sign-off.
Load and transfer
It stays in your systems and the capability stays with your team.
VSC platforms for large-scale mining
Large-scale mining questions
When should operational readiness start on a large-scale mining project?
At pre-feasibility, to start with the operating model and the OR strategy. Staffing, training, long-lead spares and master data are planned from there: their lead times cannot be recovered if you start late, and that is what delays start-up.
Does VSC work alongside the EPCM and the owner's departments?
Yes. VSC works on the owner's side: it organises what each department must have ready, reviews what engineering delivers, and every deliverable is validated by a VSC senior expert.
What happens to maintenance once the site is operating?
What was prepared before the start of operations is picked up by MagEAM, VSC's platform for maintenance work management: from the field notification to the executed, closed and measured work order.
Does it work for the expansion of an operating plant?
Yes. Readiness for the new part is organised separately, without mixing it with the running operation, and connected to the systems the site already uses.