Typical situation

The maintenance superintendent reviews the week's schedule. The mechanic who has worked on the primary crusher for 28 years retires in March. He changes the bearing in less time than the procedure allows for, and nobody else knows how he does it. The work order only says “bearing replaced”.

This is a typical industry situation, not a client case.

In brief

It loses their experience and what was never recorded: the symptoms that announce a failure, the adjustments missing from the manual, the reason for each task and whom to call. That knowledge is recorded before they leave. First, identify the specialists close to retirement whose know-how nobody else has. Then move what they know into the maintenance strategy, the task lists, the failure catalog and the work order.

How much maintenance knowledge is close to retirement?

A lot, and maintenance technicians are the group with the highest demand. According to CCM-Eleva (2025), Chilean large-scale mining will need 36,895 new workers between 2025 and 2034, and 87.4% of them will replace people who retire.

Demand for maintenance technicians in Chilean large-scale mining, 2025 to 2034
ProfilePeople
Mechanical maintainer9,257
Electromechanical maintainer1,779
Electrical maintainer1,680
Instrumentation maintainer357
Total maintainers13,073
Source: CCM-Eleva (2025), pp. 115 and 123. The mechanical maintainer is the profile with the highest demand in the study. The study assumes effective retirement at 60.

In 2024, 17.2% of mining companies' own staff were 55 or older, according to the same study. And the risk is not only in their own staff, because 41% of contractor staff are maintenance workers.

The same happens outside Chile. According to MiHR (2026), Canadian mining expects 212,556 exits between 2026 and 2035, and heavy-duty equipment mechanics are among the hardest jobs to fill.

Black-and-white mechanics training workshop, with apprentices working at lathes and workbenches
Mechanics training workshop, Switzerland, 1983. Photo: Hans Krebs, ETH-Bibliothek Zürich, Bildarchiv, Com_L32-0073-0002-0001, CC BY-SA 4.0, via Wikimedia Commons.

What exactly is lost when the person leaves?

What the person knows and never wrote down. Polanyi (1966) put it in one sentence: “we can know more than we can tell”. In maintenance, that know-how takes five forms, and each one has a place where it should end up.

What the experienced technician knows and where it should end up
What they knowExampleWhere it should end up
The symptoms that announce a failureA noise or a temperature that shows up weeks beforeFailure catalog and inspection task lists
The reason for each frequencyChanging a component earlier than the manual saysMaintenance strategy, by failure mode
Adjustments that are not in the manualA clearance or an assembly sequence specific to the equipmentWork procedures
The history of each itemWhat was changed, when and whyTechnical close-out of the work order
Whom to callThe supplier or the alternative spare part that worksMaterials master and the area's supplier list

The standard already asks you to deal with it. ISO 55001:2024 adds clause 7.7, on knowledge, according to the NQA (2024) guide. Among other things, it asks you to retain existing knowledge and keep it accessible when deciding.

How do you measure who is at risk?

With a score per person that combines when they leave with how unique their know-how is. The method comes from the IAEA (2006), which developed it for the nuclear industry, and it works just as well for mine maintenance.

The two factors of the risk score, from 1 to 5
ValueAttrition factor: when they leavePosition factor: how unique their know-how is
5This year or nextCritical and unique, undocumented, 3 to 5 years of training and no ready replacement
4In the third yearCritical and partly documented, 2 to 4 years of training
3In the fourth yearImportant and systematized, 1 to 2 years of training
2In the fifth yearProcedural, less than a year of training
1In the sixth year or laterCommon knowledge
Score = attrition factor × position factor. 20 to 25, immediate action. 16 to 19, priority. 10 to 15, high importance. 1 to 9, important. Source: IAEA (2006), tables 1 to 3, summarized.

The IAEA makes a useful point: high performance is not the basis for a high position factor. What counts is whether anyone else can do what this person does.

How do you capture that knowledge before the person leaves?

With a six-step method that starts a year before retirement, not the week before. The maintenance team itself can run it.

  1. List people and dates. With HR, note who retires, who may leave and when, for the next three to five years.

  2. Score each person. Multiply how close their departure is by how unique their know-how is, each factor from 1 to 5, as in the table above.

  3. Pick the equipment that matters. For each person in red, cross what they know with equipment criticality. Start with critical equipment that only that person knows in depth.

  4. Interview them in the field, in front of the equipment. Ask about failure modes, symptoms, adjustments, tools and suppliers. A conversation in the office captures less than a walk beside the equipment.

  5. Move what they said into the deliverables. Symptoms go into the failure catalog and inspection task lists. The reason for each frequency goes into the maintenance strategy, and adjustments into procedures.

  6. Check it with a peer. Before the departure, a younger technician performs the task with the new procedure, and the one leaving corrects them. If the peer cannot do it alone, something is still unwritten.

What is captured gets used when the maintenance manager brings it to the weekly meeting. If the new failure catalog does not show up in the notifications of the following weeks, the knowledge is back in a document.

What should you check when the departure is a year away?

Go through these points with the supervisor of the person who is leaving:

Frequently asked questions

What is tacit knowledge in maintenance?

It is what a technician knows how to do and is not written in any document. For example, recognizing a failure by its sound, or knowing which adjustment a particular machine needs.

How far ahead should you start?

At least a year before the departure. According to the IAEA (2006), critical and unique know-how can take 3 to 5 years of training, so the score should cover the next five years.

What if the person has already retired?

Part of what they knew can be rebuilt from the history of work orders and notifications, and by interviewing the people who worked with them. If the person is available, paid advice by the hour during the transition helps close the gaps.

Next step

Do you have key technicians close to retirement and a maintenance strategy that does not record what they know? The Maintenance Diagnostic for the Standard compares your strategy with the standard and with what your system needs. It delivers the gaps, with the steps to close them, in 4 to 6 weeks.

Sources

  1. CCM-Eleva (2025). “Estudio de Fuerza Laboral de la Gran Minería Chilena 2025-2034: Diagnóstico y Recomendaciones” (Chilean large-scale mining workforce study), 10th edition, December 2025, pp. 10, 12, 115, 118, 123 and 131. ccm-eleva.cl
  2. MiHR (2026). “Canadian Mining Labour Market Outlook 2026”, Mining Industry Human Resources Council, baseline scenario 2026-2035, pp. 34 to 37. mihr.ca
  3. IAEA (2006). “Risk Management of Knowledge Loss in Nuclear Industry Organizations”, STI/PUB/1248, Vienna, tables 1 to 3, pp. 8 and 9. www-pub.iaea.org
  4. Polanyi, M. (1966). “The Tacit Dimension”, p. 4. Listing of the 2009 University of Chicago Press edition. chicagoreference.com
  5. ISO (2024). ISO 55001:2024, “Asset management. Asset management system. Requirements”, 2nd edition, July 2024, clause 7.7. iso.org
  6. NQA (2024). “ISO 55001:2014 to 2024 Gap Guide”, transition guide from a certification body. nqa.com